Operational risks have been evaluated for a multilayered vessel through the fitness-for-service (FFS) assessment. The vessel has been in service for more than four decades and is subjected to cyclic mechanical and thermal loads during normal operations. Leakage has been found over the years by inspections, which led to safety concerns for continued operation. FFS assessment was used to evaluate the condition of the vessel to determine if the vessel was fit for continued operation and the associated risks for a catastrophic type failure or burst of all layers of the vessel. Finite element analysis and fatigue evaluation, with associated partial probability, were conducted for the assessment per API 579. The operational risks were evaluated on the combined basis of FFS assessment results, failure modes, and field inspection findings. It was concluded that, despite of the problems found during inspections, risks for the catastrophic type failure of the multilayered vessel are very low and continued operation with appropriate monitoring and maintenance is recommended.
Skip Nav Destination
ASME 2012 Pressure Vessels and Piping Conference
July 15–19, 2012
Toronto, Ontario, Canada
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
978-0-7918-5502-7
PROCEEDINGS PAPER
Risk-Based Operations Assessment of a Multilayered Vessel Under Cyclic Loading Conditions
Mingxin Zhao,
Mingxin Zhao
UOP LLC, A Honeywell Company, Des Plaines, IL
Search for other works by this author on:
Richard Parkinson
Richard Parkinson
UOP LLC, A Honeywell Company, Des Plaines, IL
Search for other works by this author on:
Mingxin Zhao
UOP LLC, A Honeywell Company, Des Plaines, IL
Richard Parkinson
UOP LLC, A Honeywell Company, Des Plaines, IL
Paper No:
PVP2012-78048, pp. 489-496; 8 pages
Published Online:
August 8, 2013
Citation
Zhao, M, & Parkinson, R. "Risk-Based Operations Assessment of a Multilayered Vessel Under Cyclic Loading Conditions." Proceedings of the ASME 2012 Pressure Vessels and Piping Conference. Volume 3: Design and Analysis. Toronto, Ontario, Canada. July 15–19, 2012. pp. 489-496. ASME. https://doi.org/10.1115/PVP2012-78048
Download citation file:
6
Views
0
Citations
Related Proceedings Papers
Related Articles
The Use of Risk-Based Approaches in Post-Construction Standards
J. Pressure Vessel Technol (August,2000)
Risk-Based Maintenance Planning for Deteriorating Pressure Vessels With Multiple Defects
J. Pressure Vessel Technol (August,2017)
PVRC Division on Continued Operation of Equipment
J. Pressure Vessel Technol (February,2000)
Related Chapters
Subsection NB—Class 1 Components
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
PSA Level 2 — NPP Ringhals 2 (PSAM-0156)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)