FEM calculations and leakage experiments are carried out for bolted flanged connections with metal flat gaskets. It is found that the sealing performance of bolted flanged connections with raised face metal gaskets under internal pressure is improved significantly when the contact gasket stress reaches the gasket yield stress. In our FEM calculations it is demonstrated that the contact gasket stress at the outside diameter is bigger than that at the inside diameter due to the flange rotation. It is also found from the leakage test results and the FEM calculations that the sealing performance of the bolted flange connections with metal flat gasket is better than that of the metal gasket in platen device tests,. In addition, the contact stress in the joints with RTJ (ring type joint) gasket is examined and 4 stress peaks on the oval type and 8 peaks on the octagonal type are found. From the obtained results, a method for determining the bolt preloads in the bolted joints using flat metal gaskets and RTJ gaskets under internal pressure is proposed taking account the given allowable leak rate. Finally, the leak rates for bolted flanged connections tightened under internal pressure are compared with the experimental results. The new method can be proposed for determining the bolt preload for bolted flange connections with metal gaskets under internal pressure at room temperature.
Skip Nav Destination
ASME 2015 Pressure Vessels and Piping Conference
July 19–23, 2015
Boston, Massachusetts, USA
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
978-0-7918-5695-6
PROCEEDINGS PAPER
A Determination Method of Bolt Preload for Bolted Pipe Flange Connections With Metal Gaskets Under Internal Pressure
Koji Kondo,
Koji Kondo
Shinko Plantech Co Ltd, Yokohama, Japan
Search for other works by this author on:
Toshiyuki Sawa
Toshiyuki Sawa
Hiroshima University, Hiroshima, Japan
Search for other works by this author on:
Koji Kondo
Shinko Plantech Co Ltd, Yokohama, Japan
Toshiyuki Sawa
Hiroshima University, Hiroshima, Japan
Paper No:
PVP2015-45163, V002T02A009; 6 pages
Published Online:
November 19, 2015
Citation
Kondo, K, & Sawa, T. "A Determination Method of Bolt Preload for Bolted Pipe Flange Connections With Metal Gaskets Under Internal Pressure." Proceedings of the ASME 2015 Pressure Vessels and Piping Conference. Volume 2: Computer Technology and Bolted Joints. Boston, Massachusetts, USA. July 19–23, 2015. V002T02A009. ASME. https://doi.org/10.1115/PVP2015-45163
Download citation file:
54
Views
0
Citations
Related Proceedings Papers
Related Articles
Stress Analysis and Sealing Performance Evaluation in Rectangular Box-Shape Bolted Flange Connection With Gasket Subjected to Internal Pressure
J. Pressure Vessel Technol (April,2011)
Finite Element Method Stress Analysis and Evaluation of the Sealing Performance in Box-Shape Flange Gasketed Connections Subjected to Internal Pressure
J. Pressure Vessel Technol (October,2017)
Stress Analysis and Determination of Bolt Preload in Pipe Flange Connections With Gaskets Under Internal Pressure
J. Pressure Vessel Technol (November,2002)
Related Chapters
Pressure Testing
Process Piping: The Complete Guide to ASME B31.3, Third Edition
Pipe Flange Leakage and Stress
Applying the ASME Codes: Plant Piping & Pressure Vessels (Mister Mech Mentor, Vol. 2)
Openings
Guidebook for the Design of ASME Section VIII Pressure Vessels