1-8 of 8
Keywords: repair
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Proc. ASME. PVP2022, Volume 1: Codes and Standards, V001T01A078, July 17–22, 2022
Paper No: PVP2022-84425
... provisions for material procurement, design, fabrication, installation, and testing of technically superior HDPE piping as a cost-competitive permanent replacement for degraded buried safety related Class 3 carbon steel piping. reactor/nuclear nonmetals polymers safety/risk/reliability repair...
Topics: Pipes, Risk, Safety
Proceedings Papers

Proc. ASME. PVP2021, Volume 5: Operations, Applications, and Components; Seismic Engineering; Non-Destructive Examination, V005T07A006, July 13–15, 2021
Paper No: PVP2021-62435
... lean of the drum relative to the adjoining support structure. This paper describes the inspection, engineering analysis, and repair performed after discovery of this challenging situation. Initial inspection included quantitative measurement of the drum displacement and skirt cracking. Engineering...
Proceedings Papers

Proc. ASME. PVP2019, Volume 1: Codes and Standards, V001T01A007, July 14–19, 2019
Paper No: PVP2019-94080
... Abstract The Primary Water Stress Corrosion Cracking causes existing ASME BPV Code Section XI inspection and repair methodology to need enhancement. This forms the basis for Code Case N-770 and revisions through 6. The paper includes the bases for examination requirements, examination schedule...
Proceedings Papers

Proc. ASME. PVP2019, Volume 8: Seismic Engineering, V008T08A032, July 14–19, 2019
Paper No: PVP2019-93057
... be used by decision-makers (authorities, stockholders, owners and contractors) to structure budget allocation strategy for seismic risk mitigation measures such as repair, retrofit, and/or replacement of steel and concrete pipelines. A stochastic model is presented to establish optimal mitigation measures...
Proceedings Papers

Proc. ASME. PVP2019, Volume 3: Design and Analysis, V003T03A005, July 14–19, 2019
Paper No: PVP2019-93673
.... These sharpness growth rates were subsequently studied and their relationship with overall cycle times analyzed. The study also shows that individual coke drums can experience different sharpness growth rates and there can be a distribution of these rates. To determine when repairs should be conducted, coke drum...
Proceedings Papers

Proc. ASME. PVP2005, Volume 1: Codes and Standards, 321-323, July 17–21, 2005
Paper No: PVP2005-71158
... 04 08 2008 Proceedings of PVP2005 evalu is req provi const Also those recog R new 2. I withi Stand meth testin perm pipin and S comp (inclu stand Press1 Copyright © 2005 by ASME ation/fitness-for-service analysis, a repair or replacement uired for continued operation. A few repair...
Proceedings Papers

Proc. ASME. PVP2005, Volume 6: Materials and Fabrication, 41-47, July 17–21, 2005
Paper No: PVP2005-71697
... on an emergent basis. Since that time, Framatome ANP has developed state-of-the-art modification methods for the repair of BMNs using the Electrical Power Research Institute (EPRI) managed Materials Reliability Program (MRP) attributes for an ideal repair as a basis for evaluation of modification concepts...
Proceedings Papers

Proc. ASME. PVP2006-ICPVT-11, Volume 1: Codes and Standards, 421-427, July 23–27, 2006
Paper No: PVP2006-ICPVT-11-93690
... 21 07 2008 A private guideline of a weld overlay (WOL) repair method for SCC cracked Boiling Water Rector (BWR) primary piping was provided by Thermal and Nuclear Power Engineering Society of Japan. In the WOL method, the overlaid structure of SCC resistant 308L weld metal substitutes...