The combined-cycle cogeneration facility on the central campus of Texas A&M University was analyzed for its present performance and an optimized mode of operation. The analysis was carried out using a plant Energy Optimization Program (EOP) that has been developed by Sega, Inc. The program uses Dither algorithms to match the energy demand and supply at each energy level (node), by choosing the lowest cost supplier among all the energy suppliers at the energy node. When this is done for all the energy nodes as the campus load varies throughout the year, one can determine the hourly and then the annual cost of operating the plant under both the existing and the optimized modes. The results were also compared with those obtained by using the Navy’s Civil Engineering Laboratory Cogeneration Analysis Program (CELCAP), and the agreement was within 5 percent. Comparison with actual costs produced an agreement to within 1 percent. Finally, certain recommendations are made as to a more cost-efficient mode of operating the present facility.
Skip Nav Destination
Article navigation
March 1993
Research Papers
System Optimization of the Cogeneration Facility at Texas A&M University—Present Operation and Load
A. Athar,
A. Athar
Battelle-Pacific Northwest Laboratories, Richland, WA 99352
Search for other works by this author on:
S. Somasundaram,
S. Somasundaram
Battelle-Pacific Northwest Laboratories, Richland, WA 99352
Search for other works by this author on:
W. D. Turner
W. D. Turner
Energy Systems Laboratory, Department of Mechanical Engineering, Texas A&M University, College Station, TX 77843
Search for other works by this author on:
A. Athar
Battelle-Pacific Northwest Laboratories, Richland, WA 99352
S. Somasundaram
Battelle-Pacific Northwest Laboratories, Richland, WA 99352
W. D. Turner
Energy Systems Laboratory, Department of Mechanical Engineering, Texas A&M University, College Station, TX 77843
J. Energy Resour. Technol. Mar 1993, 115(1): 17-22 (6 pages)
Published Online: March 1, 1993
Article history
Received:
September 6, 1989
Revised:
August 25, 1992
Online:
April 16, 2008
Citation
Athar, A., Somasundaram, S., and Turner, W. D. (March 1, 1993). "System Optimization of the Cogeneration Facility at Texas A&M University—Present Operation and Load." ASME. J. Energy Resour. Technol. March 1993; 115(1): 17–22. https://doi.org/10.1115/1.2905964
Download citation file:
4
Views
Get Email Alerts
Cited By
Influence of Inlet Mud Temperature on Bottom Hole Mud Temperature During Horizontal Well Drilling
J. Energy Resour. Technol (June 2023)
Integration of Dynamic Models and Virtual Reality for the Training of Steam Generator Operators
J. Energy Resour. Technol (June 2023)
Synergy in Syngas Yield From Co-Pyrolysis of Cow and Chicken Manures
J. Energy Resour. Technol (June 2023)
Related Articles
Single Piles and Pile Groups Under Lateral Loading
Appl. Mech. Rev (January,2002)
SUPERTARGETING: Optimum Synthesis of Energy Management Systems
J. Energy Resour. Technol (September,1989)
Supervisory Feed-Forward Control for Real-Time Topping Cycle CHP Operation
J. Energy Resour. Technol (March,2010)
Mechanics of Materials and Interfaces: The Disturbed State Concept
J. Electron. Packag (December,2001)
Related Chapters
Performance and Mechanical Equipment Standards
Handbook for Cogeneration and Combined Cycle Power Plants, Second Edition
Discussion of Parameters to Be Monitored
Consensus on Operating Practices for the Sampling and Monitoring of Feedwater and Boiler Water Chemistry in Modern Industrial Boilers (CRTD-81)
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration