The development and testing of an integrated power module (IPM) for a waste heat recovery system is described. The IPM is part of a waste heat recovery system based on the organic Rankine cycle. The waste heat system can recover energy from a wide variety of heat sources including landfill gas, reciprocating engine exhaust, solar, geothermal, boilers, and other industrial processes. The IPM incorporates a high performance, high speed permanent magnet generator with an integrated expansion turbine and low loss magnetic bearings. The IPM operates between 20,000 rpm and 26,500 rpm depending on the energy available from the heat source. The varying frequency voltage supplied by the generator is connected to the grid using an active/active power electronics package that can deliver power at (50 Hz or 60 Hz). Active magnetic bearings (AMBs) were chosen for the application because they can operate directly in the working fluid, have low losses, and provide high reliability and remote monitoring capabilities. This system has a flow-through design and an inboard impeller layout that produces desirable rotordynamics for a simple magnetic bearing control. An extensive shop testing procedure is described, and measurements and predictions are presented, showing good correlation. Shop testing of the IPM in the waste heat system has been completed for 15 systems. The magnetic bearings and backup bearings have performed as designed. The thrust balancing system has limited the thrust load that must be reacted by the axial magnetic bearings to 25% of the design load capacity in the worst case. The first field unit was installed in April 2009 at a biogas site.
Skip Nav Destination
e-mail: eblumber@calnetix.com
Article navigation
July 2011
Research Papers
Development of a 125 kW AMB Expander/Generator for Waste Heat Recovery
Eric J. Blumber
e-mail: eblumber@calnetix.com
Eric J. Blumber
Calnetix Power Solutions, Inc.
, 23695 Via Del Rio, Yorba Linda, CA 92887
Search for other works by this author on:
Lawrence A. Hawkins
Lei Zhu
Eric J. Blumber
Calnetix Power Solutions, Inc.
, 23695 Via Del Rio, Yorba Linda, CA 92887e-mail: eblumber@calnetix.com
J. Eng. Gas Turbines Power. Jul 2011, 133(7): 072503 (6 pages)
Published Online: March 16, 2011
Article history
Received:
May 9, 2010
Revised:
May 12, 2010
Online:
March 16, 2011
Published:
March 16, 2011
Citation
Hawkins, L. A., Zhu, L., and Blumber, E. J. (March 16, 2011). "Development of a 125 kW AMB Expander/Generator for Waste Heat Recovery." ASME. J. Eng. Gas Turbines Power. July 2011; 133(7): 072503. https://doi.org/10.1115/1.4002660
Download citation file:
Get Email Alerts
Blade Excitation Alleviation of a Nozzleless Radial Turbine by Casing Treatment Based on Reduced Order Mode
J. Eng. Gas Turbines Power
Design And Testing of a Compact, Reverse Brayton Cycle, Air (R729) Cooling Machine
J. Eng. Gas Turbines Power
Experimental Study on Liquid Jet Trajectory in Cross Flow of Swirling Air at Elevated Pressure Condition
J. Eng. Gas Turbines Power
Related Articles
Test Results and Analytical Predictions for Rotor Drop Testing of an Active Magnetic Bearing Expander/Generator
J. Eng. Gas Turbines Power (April,2007)
Single Plane Radial, Magnetic Bearings Biased With Poles Containing Permanent Magnets
J. Mech. Des (March,2003)
Effect of Thrust Magnetic Bearing on Stability and Bifurcation of a Flexible Rotor Active Magnetic Bearing System
J. Vib. Acoust (July,2003)
On the Use of Actively Controlled Auxiliary Bearings in Magnetic Bearing Systems
J. Eng. Gas Turbines Power (March,2009)
Related Chapters
Threshold Functions
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Introduction
Design of Mechanical Bearings in Cardiac Assist Devices
Physiology of Human Power Generation
Design of Human Powered Vehicles