The modernization of hydro-generators can involve the analysis of many different manufacturer’s designs of thrust bearings. Recent designs of bearing in common use are very reliable, but when failures do occur, it is often with older machines and within the first few minutes of start-up. This paper is a result of general design studies of various thrust bearing configurations subjected to transient operating conditions. It is shown that transient effects can induce an ‘overshoot’ of thermal deformation which can become unstable, leading to ‘thermal ratchetting.’ Examples are given of pads of various manufacturer’s bearings that have been subjected to this mechanism. Results from operating turbines, basic studies and measurements of the thermal bending of plates indicate that a peak deflection occurs well before thermal equilibrium is attained. The peaking phenomenon may be obscured in some designs or in cases where the run-up is gradual. The beneficial effects of using an oil-lift system during start-up are described. During shut-down it is important that the contact of hot, crowned pads against the runner be prevented. Minimum times for operation of the lift system are suggested, based on the thickness of the pads.
Skip Nav Destination
Article navigation
October 2003
Technical Papers
Some Effects of Start-Up and Shut-Down on Thrust Bearing Assemblies in Hydro-Generators
C. M. Ettles,
C. M. Ettles
Tribology Group, Department of Mechanical, Aerospace and Nuclear Engineering, Rensselaer Polytechnic Institute, Troy, NY 12180-3590
Search for other works by this author on:
J. Seyler,
J. Seyler
Voith Siemens Hydro Power Generation, Inc., 2185 North Sheridan Way, Mississauga, Ontario L5K 1A4, Canada
Search for other works by this author on:
M. Bottenschein
M. Bottenschein
Voith Siemens Hydro Power Generation, GmbH & Co. KG, Alexanderstrasse 11, 89522 Heidenheim, Germany
Search for other works by this author on:
C. M. Ettles
Tribology Group, Department of Mechanical, Aerospace and Nuclear Engineering, Rensselaer Polytechnic Institute, Troy, NY 12180-3590
J. Seyler
Voith Siemens Hydro Power Generation, Inc., 2185 North Sheridan Way, Mississauga, Ontario L5K 1A4, Canada
M. Bottenschein
Voith Siemens Hydro Power Generation, GmbH & Co. KG, Alexanderstrasse 11, 89522 Heidenheim, Germany
Contributed by the Tribology Division for publication in the ASME JOURNAL OF TRIBOLOGY. Manuscript received by the Tribology Division March 12, 2002; revised manuscript received July 30, 2002. Associate Editor: L. San Andre´s.
J. Tribol. Oct 2003, 125(4): 824-832 (9 pages)
Published Online: September 25, 2003
Article history
Received:
March 12, 2002
Revised:
July 30, 2002
Online:
September 25, 2003
Citation
Ettles, C. M., Seyler, J., and Bottenschein, M. (September 25, 2003). "Some Effects of Start-Up and Shut-Down on Thrust Bearing Assemblies in Hydro-Generators ." ASME. J. Tribol. October 2003; 125(4): 824–832. https://doi.org/10.1115/1.1576428
Download citation file:
Get Email Alerts
Factor Analysis-Based Selection of Xanthoceras sorbifolia Bunge Oil as a Promising Bio-Based Lubricant
J. Tribol (February 2025)
A Review on Mechanical and Wear Characteristics of Magnesium Metal Matrix Composites
J. Tribol (February 2025)
Related Articles
Design and Performance Prediction of Hybrid Air Foil Thrust Bearings
J. Eng. Gas Turbines Power (April,2011)
Tribological Study of a Slider Bearing in the Supersonic Regime
J. Tribol (October,2016)
Recess Depth Optimization for Rotating, Annular, and Circular Recess Hydrostatic Thrust Bearings
J. Tribol (January,2010)
Effects of Misalignment on Turbulent Flow Hybrid Thrust Bearings
J. Tribol (January,2002)
Related Proceedings Papers
Related Chapters
The Special Characteristics of Closed-Cycle Gas Turbines
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Studies Performed
Closed-Cycle Gas Turbines: Operating Experience and Future Potential